5 mega watt Hydro Energy project based in Himachal Pradesh. Daily generation is approx. 1,20,000 units Power purchase agreement (PPA) rate is approx. 5 per Unit Estimated DPR ( Detailed project report ) cost is approx. 50 crores INR Subsidy per mega watt : approx. is 1.50 crores INR Monthly income ( profit) approx. is 1.80 crores INR
Clientele type
Government of various states.
Premises
OWNED
Premise Size: 12.00 sq km
Market Value (in INR): 55.00 Cr
The project is located in Chamba district, Himachal Pradesh, near the villages of Deol, Bajoli, and Nayagraon. The proposal involves diverting water from a nallah at an elevation of 2540 m to a surface power house at 1940 m elevation. The site is accessible via the Chamba-Bharmour State Highway to Holi village, followed by a route to the powerhouse near Deol, approximately 80 km from Chamba. The nearest broad-gauge railhead is at Pathankot, Punjab.
Asking Price Includes
Civil Works: 2096.81 lacs Electrical Works: 1003.84 lacs Transmission: 136.00 lacs Total Project Cost: 3236.64 lacs Interest During Construction: 391.71 lacs Total Cost Including IDC, FC, LADC: 3900.54 lacs
Reason
The business is involved in construction and sale on regular basis. Looking for an investor for 5 mega watt Hydro Energy project based
More Details
Investing in hydro projects presents a unique opportunity to align financial objectives with environmental stewardship. The project’s geographical coordinates for the diversion weir are 76°-22'26" E and 32°-23'47" N, while the powerhouse coordinates are 76°-37'12" E and 32°-17'41" N. The catchment area is 12 sq. km, with 4.9 sq. km snow-fed and 7.1 sq. km rain-fed. The design discharge is 0.99 cumec, with a design flood of 50 cumec. Key structures include a drop-type trench weir at 2540 m elevation with a 1.00 m x 10.00 m trench size, conveying water through a 1.00 m x 1.40 m rectangular channel over 85 m with a 1:450 slope. A 2 m D-shaped headrace tunnel (HRT) spans 1360 m. The desilting arrangement includes a central silt gutter designed to exclude particles of 0.20 mm size, and the surface forebay has a storage capacity of 225 cum. The penstock is a 650 mm diameter surface steel pipe, 1260 m in length, leading to a surface power house measuring 28 m x 13 m x 10/12 m. The power house is equipped with two Pelton turbines, each with a 2500 kW capacity, totaling 5 MW. The gross head is 600 m, and the net head is 581.47 m. The estimated cost of the project is Rs. 3900.54 lac, which includes Rs. 2096.81 lac for civil works, Rs. 1003.84 lac for electrical works, and Rs. 136 lac for transmission. The total project cost includes interest during construction of Rs. 391.71 lac. A Power Purchase Agreement (PPA) has been applied for at a rate of Rs. 5 per unit, though the forest NOC is still pending. The new DPR survey has been completed, with a revised project estimate of around Rs. 55 crores. Energy generation is expected to be 22.27 MU annually, with 20.09 MU available for sale after accounting for losses and royalty.
Keywords
Business Tags
₹10 to ₹200 Cr
Complete Investment Banking Solution in 120 Days
Seamless Fundraising/M&A transactions
Start your growth journey with our 25+ Years of Experienced Professional Team.
Contact IBGrid Team