Hydro Energy Project For Sale In Himachal Pradesh
Product / Service
5 mega watt Hydro Energy project based in Himachal Pradesh. Daily generation is approx. 1,20,000 units Power purchase agreement (PPA) rate is approx. 5 per Unit Estimated DPR ( Detailed project report ) cost is approx. 50 crores INR Subsidy per mega watt : approx. is 1.50 crores INR Monthly income ( profit) approx. is 1.80 crores INR
Clientele type
Government of various states.
Premises
OWNED
Premise Size: 12.00 sq km
Market Value (in INR): 55.00 Cr
The project is located in Chamba district, Himachal Pradesh, near the villages of Deol, Bajoli, and Nayagraon. The proposal involves diverting water from a nallah at an elevation of 2540 m to a surface power house at 1940 m elevation. The site is accessible via the Chamba-Bharmour State Highway to Holi village, followed by a route to the powerhouse near Deol, approximately 80 km from Chamba. The nearest broad-gauge railhead is at Pathankot, Punjab.
Asking Price Includes
Civil Works: 2096.81 lacs Electrical Works: 1003.84 lacs Transmission: 136.00 lacs Total Project Cost: 3236.64 lacs Interest During Construction: 391.71 lacs Total Cost Including IDC, FC, LADC: 3900.54 lacs
Reason
The business is involved in construction and sale on regular basis. Looking for an investor for 5 mega watt Hydro Energy project based
Other Details
Investing in hydro projects presents a unique opportunity to align financial objectives with environmental stewardship. The project’s geographical coordinates for the diversion weir are 76°-22'26" E and 32°-23'47" N, while the powerhouse coordinates are 76°-37'12" E and 32°-17'41" N. The catchment area is 12 sq. km, with 4.9 sq. km snow-fed and 7.1 sq. km rain-fed. The design discharge is 0.99 cumec, with a design flood of 50 cumec. Key structures include a drop-type trench weir at 2540 m elevation with a 1.00 m x 10.00 m trench size, conveying water through a 1.00 m x 1.40 m rectangular channel over 85 m with a 1:450 slope. A 2 m D-shaped headrace tunnel (HRT) spans 1360 m. The desilting arrangement includes a central silt gutter designed to exclude particles of 0.20 mm size, and the surface forebay has a storage capacity of 225 cum. The penstock is a 650 mm diameter surface steel pipe, 1260 m in length, leading to a surface power house measuring 28 m x 13 m x 10/12 m. The power house is equipped with two Pelton turbines, each with a 2500 kW capacity, totaling 5 MW. The gross head is 600 m, and the net head is 581.47 m. The estimated cost of the project is Rs. 3900.54 lac, which includes Rs. 2096.81 lac for civil works, Rs. 1003.84 lac for electrical works, and Rs. 136 lac for transmission. The total project cost includes interest during construction of Rs. 391.71 lac. A Power Purchase Agreement (PPA) has been applied for at a rate of Rs. 5 per unit, though the forest NOC is still pending. The new DPR survey has been completed, with a revised project estimate of around Rs. 55 crores. Energy generation is expected to be 22.27 MU annually, with 20.09 MU available for sale after accounting for losses and royalty.
Business Tags
₹10 to ₹200 Cr
Complete Investment Banking Solution in 120 Days
Seamless Fundraising/M&A transactions
Start your growth journey with our 25+ Years of Experienced Professional Team.
Contact IBGrid TeamFrequently Asked Questions
How to contact a business owner directly to buy or invest in a business?
Connecting with a business owner directly is simple! Just follow these 3 easy steps: 1. Create your FREE Investor/Buyer profile on IndiaBizForSale 2. Explore the 'Business Opportunities' section to find 10,000+ business opportunities matching your investment preferences. 3. Click on the 'Contact Business' button and connect with business owner directly. Check here to know how it worksNote: Once you create your profile, you will get ONE introduction credit, allowing you to contact any ONE featured business.
How does IndiaBiz verify the business information?
The business opportunity is either posted by the business owner or advisor. After that, our team checks the information for completeness, language, and accuracy. Once the basic checks are met; only then the opportunity is published. We also get users' feedback for the opportunities they contact and based on their feedback, the opportunity maybe put on HOLD till further clarification. Many opportunities are not published when it does not pass through our internal procedure checks. We sincerely request you to carry out complete due diligence before taking the transaction ahead. In addition, the contact details of the business are verified via phone/email.
What to consider before buying or investing in a business?
Below are some of the factors that need to be considered before buying or investing in a business:- Growth prospects of the industry and business
- Sales, profitability, and cash flow of the business should be considered
- Consideration you have to pay; form of consideration (either cash or shares or some combination of both) to be paid?
- Source of financing the purchase
- Amount of additional investment that will be required to grow business
- Does the business have second-line of management?
- Are you going to run the business on day-to-day basis or appoint some professional for the same?
- What decisions are to be taken to improve the profitability of the business?
- Time period of payback or return is envisaged from the business?
- Any long-term strategic benefit or synergy with your existing business?
- Will the clients continue with the business after the acquisition?